PWD SCHEDULE BOOK 2017
C1-C4 FIXING RATE
D1-D15 SUPPLYING&FIXING
E1-E25 WIRING SYSTEM
F1-F6 XLPE/PVC INSULATED &ARMOURED CABLES
G1-G3 EARTHING
H1-H6 OH INSTALLATION (LT DISTB)
I1-I2 OVERHEAD LINE INSTALLATION - REPAIR
J1-J2 LIGHTNING CONDUCTOR
K1-K4 RATE OF MATERIALS
K1-K25 AL. CONDUCTOR UPTO 1100V
Name of Work:
Report:
Reference:
Sl. No.
Description of Items
Item
Qty
Unit
Rate
Amount
1
Add Item
Erase
Download-Excel
Summary
Total Amount
0.00
GST @ 18%
0.00
Total Rs
0.00
LWC @ 1%
0.00
Contingency @ 3%
0.00
Final Total
0.00
_
X